KENT
Home Doors Entrance Doors Fire-Rated Doors Acoustic Doors Sliding Doors Folding Doors Pivot Doors Concealed / Invisible Doors Security Doors Interior Doors Commercial Laminate Doors Cast Aluminum Doors Wall Finishes Cabinetry & Wardrobes Wardrobes & Fitted Robes Walk-in Dressing Rooms Kitchen & Bar Casework Vanities & Washroom Minibar & Pantry Media, Display & Feature Hospitality The Milano Finish Open-pore & super-matte The wood palette Finish categories Request a sample box Capabilities Full capability matrix Marquetry & Inlay Forming & Curves CNC Carving & Screens Oversized — to 8 m 3D Relief & Texture Invisible & Concealed Doors Multi-material Integration Gold Leaf & Gilding Selected Interiors Insights Contact
KENT
← All doors
Home · Hospitality

The hands behind the doors of the world's finest hotels.

From the grand entrance to the last service door, KENT is the single source of architectural joinery for luxury hospitality — finished as design, engineered for the Gulf.

200+ hotelsFire & acousticMilano finishGulf-engineered
A hotel has a thousand doors. We make every one of them feel like the same hotel.
Double-height living — integrated display shelving
Double-height living — integrated display shelving
A hospitality record, in numbers
200+
Hotel projects
1,000+
Projects worldwide
100+
Countries
36,000
Doors for KAUST, on schedule
One source, every door
Every door in the hotel, from one workshop.

Mixed suppliers mean mismatched finishes, fragmented ratings and divided responsibility. KENT supplies the whole opening schedule — so an entire property reads as one coherent interior, under one warranty.

Why specifiers choose KENT
Six advantages that matter on a hotel programme.

One platform, every door

Five door platforms and the full finish range from a single source — one specification, one delivery, one warranty across the property.

The Milano finish

0.6 mm veneer, 8 grain and 23 surface passes, ICA water-based coatings, sub-2 GU super-matte — a finish that photographs as well as it wears.

Engineered for the Gulf

Built for 45–50°C heat, 70%+ coastal humidity and Δ25°C swings — so doors stay true through the seasons, on the coast and inland.

Landmark volume, on schedule

A connected digital factory — ERP, BIM, per-door QR traceability and a live client dashboard — at 10,000 doors a month. 36,000 doors for KAUST, on time.

Certified for hotels

Fire 30–120 min (UL10C · EN1634 · BS476 · GB12955), acoustic 32–45 dB Rw (ISO 10140), plus FSC, CE and a full E0 / low-VOC stack for operator and AHJ approval.

Built around your team

We work to the developer, operator, main contractor and ID's standards — shop drawings, samples and mock-ups — so the brand standard is met without surprises.

Trusted on Gulf landmarks
Where KENT doors already hang.
How we work with hotel teams
From brief to handover.
01
Brief & specification
We take your door schedule, brand standard and design intent, and translate it into a complete specification across all door types.
02
Engineering & BIM
Shop drawings, BIM models, samples and mock-ups are coordinated with the project team for sign-off before production.
03
Manufacture & traceability
Doors are built in a digital factory with per-door QR traceability and a live dashboard, so progress is visible at every stage.
04
Delivery & site support
Phased logistics to the GCC and installation guidance keep the programme on schedule through to handover.
Send us your hotel door schedule.
Placeholder contact — replace before launch.